Neighbors bathroom #3: Progress today

Published Aug. 4, 2010 at 4:19 a.m.
793774-neighbors-bathroom--3--progress-today 793774-neighbors-bathroom--3--progress-today 793774-neighbors-bathroom--3--progress-today 793774-neighbors-bathroom--3--progress-today 793774-neighbors-bathroom--3--progress-today 793774-neighbors-bathroom--3--progress-today 793774-neighbors-bathroom--3--progress-today

Today I got the side panels connected to the plywood side, attached the face frame and the back of the linen closet and glued up the doors for the vanity, will router the face frame flush in the morning.

...





Back | Read more at Lumberjocks blogs

Tagthis You must log in to tag articles
Separate tags with commas
Rate this now!
  • Average rating: 3.0
  • 1
  • 2
  • 3
  • 4
  • 5
Number of ratings: 10 - Average rating: 3.0


Featured Advertiser: